OACI -> where we are -> europe -> romania -> Bethany Camp

Bethany Camp, New Build

Great News!

Cristi writes:
"Today (24/09/2012) the new building project at Bethany camp began.

To refresh your memory this will be a building housing a dining/kitchen area on the ground floor and bedrooms and bathrooms on the first floor.
The pictures show digging out some soil that was within the foundation in order to be replaced with rubble.
The soil was used to raise the drive way bringing it to the same level as the games area.
It was a good day, Praise God.
The soil that remains within the foundation will be compacted, then a special fabric membrane laid on the ground, insulating all the concrete foundations follows then the rubble on top."

Before

Before

Grass away!

Grass away!

Foundations clear

Foundations clear

New Build 2013 Before - 4

Please remember Cristi in your prayers as he organises the construction work bringing in the right craftsman at the right time

Blessings

P&J<><

Earlier news and plans

Bottom of the footings

Bottom of the footings

Deep Hole

Deep Hole

MARCH 2010

So far we have had a topographic survey, a geological survey and the concrete foundations tested for strength (see pictures above)

APRIL

New building - Front View

New building - Front View

Back of building - Barn on right

Back of building - Barn on right

See the design for the new Building!

OACI -> where we are -> europe -> romania -> Bethany Camp